Saturday 26 October 2013

Fore Bottom Segments Planked

The ply is stiched to the backbone by using copper wire from electric cables. The shafted joint between bulkheads C and D is fixed by some loads I had culled me on the fly.


 
 
 
Working time been invested: 804 hours

No comments:

Post a Comment