Sunday, 10 March 2013

Coming Back To The Bulb Slabs

The bulb slabs have to be covered. That will be the next task. At first the warty surface are filled. The feedthroughs are temporary sealed with wine bottle cork.


Then the slabs are glass coated using the WEST-System vacuum bagging system.



Finally a layer epoxy with Cu2O-filler against fouling. Ready!


Working time been invested: 522 hours