Saturday 28 June 2014

Preparation For Turning The Hull

 
Turning over the hull I want to accomplish by using two large rings built around the hull.
 
 
 
Each ring is built from three segments of plywood. The ring segments are cold molded from three layer of 6mm plywood strips with 150 mm width.


Monday 16 June 2014

The Planking Of The Hull Has Been Finished


A first part of the hull has already been impregnated by epoxy.
About 175 g/m² is required for this task. For the hull area of 26 m² I will need about 5 kg epoxi.

 
 
Working time been invested: 1103 hours