Sunday, 21 December 2014

Interior Joinery Continued

The salon is finished in the shell - basically. The rest are painters and parquet recliner, but not this year.


Sunday, 7 December 2014

Interior Joinery

Meanwhile it is to cold for working with epoxy outside the hull. Therefore I will focus on interior joinery until spring. Due to a tarp over the hull, it is possible to warm up the interior about 10 °C above ambient temperature with 1 kW heating power.
Two weeks ago I started the work on the V-berths in the bow section.

To capture the irregular hull contour tinkered first a template out of cardboard.

Then I transferred the template on the plywood.

After a few minor adaptation work the bench locker cover fits.