Sunday, 3 January 2016

Pushpits Installed

When positioning the pushpits there was almost no degrees of freedom. The fastening bolts must have sufficient distance from hull and bulkhead for the washers below deck. On the other hand the distance to the stowage coaming has to be sufficient to open the hatch cover later on.


Monday, 28 December 2015

Flooring

First I measured the DWL with a laser level. Then I started attaching the floor bearing strips regarding to DWL.
DWL level measured with a laser level


Working time been invested: 1770 hours

Sunday, 13 December 2015

Rudder Blade Fitted to Rudder Box

Rudder Blade and Rudder Box are largely completed since two years. Since then I know that the rudder blade clamps in the box.
Today I went to the problem. I used a copper-pipe and a plywood sheet pasted up with sandpaper to widen the slit. There were three hours of work up to success.




Saturday, 12 December 2015

Stowage Hatch Coaming


Starboard hatch coaming glued to deck
The stowages at stern should be accessible from deck. Therefore I opened the deck on starboard and portside and framed the openings with hatch coamings.
Portside hatch coaming after planing and sanding




















Friday, 4 December 2015

Stainless Steel Works

The stainless steel work for rudder gudgeons and keel lifting fittings I gave away to a professional locksmith. The result is very nice to look at, but it was not that cheap.



Saturday, 21 November 2015

Plywood-Capping on Sheer

The left photo shows the sheer after planing and sanding.






The right photo shows the plywood-capping temporarily fixed by screws. 








Plywood capping planed and sanded
Detail view of the sheer construction


As soon as it gets warmer, I will attach another plywood layer. Finally I plan to attach a sheer rail from teak on top.