Sunday, 25 September 2016

Primering Completed

The underwater ship has been coated with 4 layers EPIFANES EPOXY HB COAT now and would be ready for sliding into water - almost.

 



Sunday, 7 August 2016

Primering the Hull

Unfortunately I didn`t bought enough primer.
The total hull requires 3 times 0,75 liter EPIFANES EPOXY HB COAT per layer. The underwater hull requires 1 1/3 cans 0,75 liter EPOXY HB COAT per layer.



Remaining unevenness of the surface became visible after priming. I had feared. That is, after priming, I must fill another time.

Friday, 17 June 2016

2000 Hours Working Time Completed

Today I completed the 2,000th hour of work on my ship. Gradually I'm uncertain whether the launch can still take place this year. It is left to do too much small stuff which takes more time than expected.