Saturday, 2 April 2016

Fairing the Sheer

The sheer stringer has been covered with a 8 mm plywood cap followed by a 10 mm mahogany cleat. In order to fair the sheer-line at some sections a second layer of mahogany cleat was required.

After fairing the sheer was covered with two layers glass fabric. The transition to deck and hull was then smoothed with epoxy putty.