Saturday 2 April 2016

Fairing the Sheer

The sheer stringer has been covered with a 8 mm plywood cap followed by a 10 mm mahogany cleat. In order to fair the sheer-line at some sections a second layer of mahogany cleat was required.

After fairing the sheer was covered with two layers glass fabric. The transition to deck and hull was then smoothed with epoxy putty.

No comments:

Post a Comment