Saturday, 3 February 2018

Working on the Bulb Slabs

After casting and fairing the bulb slabs are coated with copper filled epoxy to prevent fouling. The last step is drilling the mounting holes.
 
Casted slabs before fairing



Drilling the mouting holes after coating

No comments:

Post a Comment