Friday, 17 June 2016

2000 Hours Working Time Completed

Today I completed the 2,000th hour of work on my ship. Gradually I'm uncertain whether the launch can still take place this year. It is left to do too much small stuff which takes more time than expected.

Wednesday, 11 May 2016

Lining the Engine Shaft Continued

For lining the shaft opening I cut some pluggable plywood boards. I described it in my Post of February. Now the pluggable plywood boards were glued in place, the hollow space has been filled with foam "VOSSCHEMIE UNIZELL-SCHAUM HR-AT" and covered by a plywood board cut from cockpit floor opening. The T-shaped opening has been covered with fibreglass and all corners were filled with epoxy-fillets. Afterwards I primered the shaft with EPIFANES EPOXY PRIMER.




Left: Plywood boards were glued in place. Centre: Hollow space has been filled with foam. Right: Foam surface planed by using a oscillating saw




Left: Foam surface covered by a plywood board. Centre: Edges of the T-shaped opening rounded. Right: T-shaped opening covered with fibreglass and corners filled with epoxy-fillets




Left: Surface sanded. Centre: Outboard mount glued in place. Right: Primered

Tuesday, 10 May 2016

Scoop Filled and Primered



Scoop after filling with YACHTCARE HIGH BUILD EPOXY FILLER followed by WEST EPOXY plus filler type 410 

Scoop after 2nd time filled with WEST EPOXY plus filler type 410 

Scoop after primered with EPIFANES EPOXY PRIMER

Saturday, 2 April 2016

Fairing the Sheer

The sheer stringer has been covered with a 8 mm plywood cap followed by a 10 mm mahogany cleat. In order to fair the sheer-line at some sections a second layer of mahogany cleat was required.

After fairing the sheer was covered with two layers glass fabric. The transition to deck and hull was then smoothed with epoxy putty.